fa-printPriontáil
Baile

Lee 2 Sea Walking and Cycling Route

Uimhir Thagarta Uathúil: 
CRK-C155-DEV21-151
Stádas: 
Submitted
Aighneacht: 
Development Plan Submission
Údar: 
Adam D'Arcy
Comhairliúchán: 
Draft Cork City Development Plan 2022-2028
Dáta a cuireadh isteach: 
02.10.2021 - 23:13

Tuairim

Lee 2 Sea Walking and Cycling Route
Caibidil: 
Volume 1 - Written Statement » 4. Transport and Mobility
Ábhair: 
Pedestrians
Cycle network

I think the Lee 2 Sea route should be a core objective of policy for cycling and walking through the city and should be funded and promoted. It should link with other walking and cycling routes and Greenways. The Lee2Sea route is an iconic symbol of the new thinking about our public spaces and our rediscovery of our local neighbourhoods.

Documents Attached: 
Níl