All efforts should be made to increase permeability for pedestrians/cyclists including building new accesses and opening semi-public access routes (e.g. COPE Foundation controlled gate to Tank...
|
As a current non cyclist who is in the process of buying an e bike for use in commuting and leisure activities, I think Cork has a real opportunity to be ambitious with its gloss for cycling as a...
|
In relation to Objective 4.4 (Active Travel), supporting the proposed Lee to Sea Greenway (see table 4.3) and hope for a timely delivery (4.30), particularly for its missing City Centre and...
|
Please find attached submission from the Department in relation to the Review of Cork City Development 2015-21 and Preparation of a new City Development Plan 2022-2028: Draft Consultation Stage.
|
Please see enclosed submission
|
Please refer to attached submission for our detailed response.
|
See attached letter 0132_03_00380 for submission.
|
There should be no more housing at Ennismore as the area is overpopulated and there is a need for a large Neighbourhood Park to facilitate the residents in the area.
The Middle Glanmire Road needs...
|
A bus route to Kerry Pike is missing off the CMATS plan. Please ask for extension of existing route.
Cycle lanes on Northside need to be connected.
Re-route proposed cycle lane through Glen...
|
I am forwarding an impression of my proposed motorised floating swinging bridge from Blackrock to the Tivoli Port site.
This would give an opportunity for those working in Little Island an...
|